Carbon Steel Sprocket of Engineering Transmission Machinery

Carbon Steel Sprocket of Engineering Transmission Machinery

Yuchen energy tramsmission offer you all the sprocket 
Merchandise Description
1. American CZPT, CZPTpean CZPT, Japanese CZPT
2. Pilot bore, finished bore, taper bore and unique bore CZPT
3. CZPT floor and high precision
four. Advanced heat treatment method and surface area therapy crafts
5. Far better top quality and aggressive value.
6. Material C45(1045), minimal carbon metal, 40Cr, 20CrMnTi, stainless steel these kinds of as SS316L, SS316, SS304, SS420, copper etc. CZPT
seven. CZPT sea worthy package deal to CZPTpe and American
eight. High pace electronic equipment hobbing equipment to assure the teeths good quality
9. Corrosion resistance remedy CZPT
10. Manage on tolerance and effortless to set up
eleven. Great materials and excellent treatment to make sure prolonged lifestyle span
twelve. OEM/ODM welcome
Solution demonstrate

  

   

Manufacture method

Business variety Manufacturer & Exporter
Major export industry CZPTpe, North and South The usa, Southeast Asia, CZPTia, Center East, Africa
Substance C45, low carbon metal, 40Cr, solid iron, stainless steel, copper and so forth
Production technique Cast and then machined, hobbed, if want can also weld
Warmth remedy Higher frequency quenching and so on
Floor treatment Oxide black, Galvanized, Nickel plated, Chrome plated, Sandblasting, Painted and so on
Model Type A & Type B, Solitary, CZPT, Triple – 35B10-eighty,40B9-90,50B9-ninety,60B9-ninety,80B9-ninety,100B9-ninety,120B9-eighty,140B10-sixty,160B10-6006B10-a hundred twenty five,08B9-a hundred twenty five,10B9-a hundred twenty five,12B9-a hundred twenty five,16B9-one hundred twenty five,20B9-114,24B9-90,28B9-76,32B9-seventy six, and other sprocket to match with conveyor chain, transmission chain
Packing Plywood Scenario/Pallet

    

FAQ

Q: Are you buying and selling business or company ?

A: We are manufacturing unit.

Q: How lengthy is your supply time?

A: CZPTly it is five-10 times if the products are in stock. or it is 15-twenty days if the goods are not in stock, it is according to quantity.

Q: Do you offer samples ? is it cost-free or additional ?

A: Indeed, we could offer you the sample for cost-free cost but do not shell out the value of freight.

Q: What is your conditions of payment ?

A: Payment thirty%TT in progress. 70% T/T ahead of shippment 

 

Carbon Steel Sprocket of Engineering Transmission Machinery