2 Ton Water Tube Paddy Husk Fire Package Steam Boiler Price

2 Ton Water Tube Paddy Husk Fire Package Steam Boiler Price

Boiler design Rated
ability
Rated
force
Rated
steam temp.
Energetic
grate location
Exhaust
fuel temp.
Style
effiency
Fuel
consum.
Fat Dimension
Ton/h Mpa ºC m2 ºC % kg/h Ton mm
DZL1-one.-T 1 1. 184 one.eighty five 157 eighty two 118 fourteen.two 5488*2200*2832
DZL2-1.twenty five-T 2 one.25 194 3.4 163 82 238 23.2 5900*2500*3256
DZL4-1.twenty five-T 4 one.25 194 5.eighteen 180 eighty two 472 28 6829*2550*3484
DZL6-1.25-T six one.twenty five 194 seven.fifty five 166 eighty three 685 47.six 7695*3565*4275
DZL8-one.25-T eight one.twenty five 194 10 a hundred and fifty five 83 980 52 7965*3565*4275
SZL10-1.twenty five-T ten 1.twenty five 194 12 151 eighty three.five 1128 56 7746*3773*3441
SZL12-one.twenty five-T twelve 1.twenty five 194 sixteen 158 83.five 1375 17.9 8200*2150*2300
SZL15-1.twenty five-T fifteen one.25 194 eighteen 161 eighty three.five 1698 eighteen.8 8650*2300*2500
SZL20-1.25-T twenty 1.25 194 22.nine a hundred and fifty eighty three 2241 19.1 8915*3373*3337

Observe:1.For other ability,remember to examine the following relevant items.
two.This table only shows rated force 1.0Mpa(10bar and one.25Mpa(13bar), we also manufacture boiler 1.6Mpa(16bar) and two.5Mpa(25bar).
three.The parameters are for reference, we have been bettering our engineering. If the technologies is improved, please refer to the information confirmed on drawing.

Pre-sale services:
We support client select the ideal boiler product according to distinct needs of different market. Ahead of shipping we will give basis drawing, layout drawing, boiler space layout, and so on.
In-sale provider:
We keep 24 hours online and preserve shut contacts for the duration of the production method to make certain on time shipping and delivery with excellent finished merchandise.
After-sale services:
1.supply complete range of unique spare elements.
2.We will ship engineers to your regional task internet site to information the installation and commissioning.
3.Our engineers will held a coaching for boiler workers to make sure the protected procedure.
4.Cost-free routine maintenance and fix for one yr and lifelong service.

Q1:I want to parboile rice 200 ton for every working day, what capapcity steam boiler ought to I choose?
Normally if you want to parboil rice 50 ton/day, you should use a 4 ton/h steam boiler If you want to parboil rice one hundred ton/day, you need to use a 6 ton/h steam boilerIf you want to parboil rice a hundred and fifty ton/working day, you ought to use a 8 ton/h steam boilerIf you want to parboil rice 200 ton/working day, you must use a ten ton/h steam boiler.
 Q2:I want to get a boiler for rice mill, but the boiler requirements to operate 24 hours every single day. Do your boiler can do this?
Yes, we did many tasks in rice mill,especially in Nigeria,kenya, Pakistan,Bangladesh and Tailand. If you desires the boiler operate 24hours each day, the provide of drinking water is really improtant.For a lot more specifics, remember to get in touch with us, our product sales crew will design professioanl resolution for you.
 Q3: How can I get the best price quickly?
(one) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.                (2) CZPTer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use ,   or , you can provide us your ID, it will be more convenient for our communication.
This fall: Why should I  think your boiler top quality?

(one).Energy calculation report with used supplies data

(2).a hundred%NDT(non-destructive inspection) report of steel plate, tube and welding rod

(three).a hundred% X-ray inspection(welding seam): guarantee the top quality of whole boiler

(4).Hydrostatic test: guarantee the regular functioning pressure and protection

(five).3rd-celebration inspection report:By ZheJiang Boiler Inspection Institute

(6).Passed ISO:9001 and SGS certificate.
Q5: What about the installation and Commissioning?
 After you receive the boiler, we will guide you to make some preparation for installationIf you have need, we supply engineer overseas set up and commissing support.
 But the buyer will be in charge of :
(one) The round air-tickets fees from HangCZPT metropolis to your undertaking site.
(2) Board and lodging of seller’s workers for total time period at the conclude user’s internet site.
(three) Support fee for guiding engineer:a hundred$/day/man or woman.
Q6:What is the using life of your boiler?
A:Normally the boiler is designed for 30 years life span, but with right operation and good maintenance,the boiler can be used for more than 35 several years.

Pricey buddy, please fill your inquiry content material in the below box to send out us inquiry now!
Looking CZPT to hearing from you!

 

2 Ton Water Tube Paddy Husk Fire Package Steam Boiler Price